Heavy Haul Transport Projects

PCH "Packages Control House" Buildings

Houston, TX to Argentina

PCH "Packaged Control House" buildings from manufacture in Houston, TX to Bush International Airport in Houston, TX. An Antonov 124 jet aircraft chartered to final destination of Argentina.

  • Building #1
    • 50' x 15' x 12'7" 101,299 lbs
  • Building #2
    • 50' x 15' x 12'7" 83,564 lbs
  • PCH
  • PCH
  • PCH
  • PCH
  • PCH
  • PCH
  • PCH
  • PCH
  • PCH
  • PCH

Siemens Light Rail Substation

Dallas Bishop Arts District

LGI was Contracted for the Crane/ Rigging & Transport for the DART Light Rail Bishop Arts District substation.

  • Siemens Light Rail Substation
  • Siemens Light Rail Substation
  • Siemens Light Rail Substation
  • Siemens Light Rail Substation
  • Siemens Light Rail Substation
  • Siemens Light Rail Substation
  • Siemens Light Rail Substation
  • Siemens Light Rail Substation
  • Siemens Light Rail Substation
  • Siemens Light Rail Substation
  • Siemens Light Rail Substation

Southwest Shipyard 1,200,000 lb Barge Move

LGI was contracted to move a 1,200,000 lb Barge over 24" to avoid hitting a bulkhead during the water launch. 

  • Southwest Shipyard 1,200,000 lb Barge Move
  • Southwest Shipyard 1,200,000 lb Barge Move
  • Southwest Shipyard 1,200,000 lb Barge Move
  • Southwest Shipyard 1,200,000 lb Barge Move
  • Southwest Shipyard 1,200,000 lb Barge Move
  • Southwest Shipyard 1,200,000 lb Barge Move
  • Southwest Shipyard 1,200,000 lb Barge Move

Midstream Plant Relocation Project

Madisonville, TX to Evanston, WY

66 Loads consisting of Legal Flatbeds all the way up to 18’ Wide Compressors, 17’ 5” High Plate Fins and a 105’ Long x 16’ Wide x 14’ High 200,000 lb. Cold box transported on a Dual Lane Dollie in a 5 weeks

  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project
  • Midstream Plant Relocation Project

PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD

MD Anderson Houston, TX to Midland, TX

Mural Crated 50′ Long x 12’4″ Wide x 16′ 11″ High / 65,000 lbs
13 Axle Perimeter Frame trailer used for stability of Mural During Transport MD Anderson Houston, TX to Midland, TX 
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD
  • PETER HURD MURAL / LARGEST FRESCO PAINTING EVER MOVED SUCCESSFULLY IN THE WORLD

300,000 lbs Pressure Vessel

Houston, TX to Carthage, TX

TX / 300,000 lbs 92′ Long x 10′ Wide x 12′ High Pressure Vessel transported on a 16′ Wide 24 Axle Dual Lane transporter. Total Gross weight 500,000 lbs

  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel
  • 300,000 lbs Pressure Vessel

Houston Texans Tunnel Move

NRG Stadium to Local Texans Storage Yard

This was a specialty trucking transport service project for the Houston Texans. Relocation of their gameday tunnel equipment and parts from NRG Stadium to a local storage yard in the Houston area.

  • Houston Texans Tunnel Move
  • Houston Texans Tunnel Move
  • Houston Texans Tunnel Move
  • Houston Texans Tunnel Move
  • Houston Texans Tunnel Move
  • Houston Texans Tunnel Move
  • Houston Texans Tunnel Move
  • Houston Texans Tunnel Move
  • Houston Texans Tunnel Move
  • Houston Texans Tunnel Move

GE Oil & Gas Emergency Compressor Transport

Houston, TX to Connersville, IN

12 Axle Perimeter Frame used to keep height down for expedited permitting 
132" x 132" x 176" 100,000 lbs
Specialty Transport
Oil & Gas
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport
  • GE Oil & Gas Emergency Compressor Transport

Exxon Mobil Compressor Transport

Houston, TX to Exxon Mont Belvieu, TX

418" x 162" x 185" 177,000 lbs

  • Exxon Mobil Compressor Transport
  • Exxon Mobil Compressor Transport
  • Exxon Mobil Compressor Transport
  • Exxon Mobil Compressor Transport
  • Exxon Mobil Compressor Transport
  • Exxon Mobil Compressor Transport
  • Exxon Mobil Compressor Transport
  • Exxon Mobil Compressor Transport

Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs

LGI handled all logistics of this move including numerous site visits throughout the fabrication to constantly keep an eye on progress of the module and stay in close communication with the fabricator to assist with any questions that might arise that would involve the correct shipping of this piece. On the first site visit it was explained that the piece, after final assembly , would need to be lifted with Gantry’s in order to load onto the trailer, due to the layout and the dimensions of the load beams, it was quickly determined that if the module was raised up 10″ before it was built, utilizing I-Beam spacers under each leg, then the Goldhofer trailer used, could “self load”, eliminating the added cost of Gantry’s, ultimately saving the customer Thousands of dollars.
The close eye of our sales team is what separates LGI apart from other companies, we care about what we do and want to further our relationships with our customers, as well as establish new relationships as well. This move was executed after hours, as an over dimensional load of this size, is not permitted to travel during light hours, the convoy of trucks escorts and police vehicles left the fabricator at precisely 9:15 pm and traveled through the night, negotiating several tight turns and numerous steep grade rail road tracks, arriving at the destination at 12:30 am.
We then returned the next morning and again maneuvered our way through the Shell Oil facility to arrive at the 750 ton Demag crane, which was used to lift the module into its final place. Several months of meticulous planning resulted in a flawless move with no harm to either workers or the cargo.
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs
  • Boccard Pipe Rack Module Transport 85′ Long x 22′ Wide x 14′ High / 154,000 lbs

Bauer Drilling Rig

Port of Galveston to Houston, TX

Bauer Drilling Rig move from Port of Galveston to Houston,
TX. 156,000 lbs 65′ Overall Length x 11′ Wide x 12.5′ High
  • Bauer Drilling Rig
  • Bauer Drilling Rig
  • Bauer Drilling Rig
  • Bauer Drilling Rig
  • Bauer Drilling Rig
  • Bauer Drilling Rig
  • Bauer Drilling Rig
  • Bauer Drilling Rig
  • Bauer Drilling Rig

Wacker Industries Compressor Skid

Houston, TX to Charleston, TN

3 Compressor skids from Houston, TX to Charleston, TN each at 30'  x 14' x 15'   105,000 lbs

Oil & Gas
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid
  • Wacker Industries Compressor Skid

FIVE 90,000 GALLON STORAGE TANKS

HUEHUETOCA, MEXICO TO JAL, NEW MEXICO

This specialized heavy haul required international transportation for five individual tanks from Huehuetoca, Mexico to Jal, New Mexico. Each tank has the storage capacity to hold about 90,000 gallons and weigh 173,000 lbs. each. The dimensions are 12’6″ feet in diameter and 135 feet in length.

Specialty Transport
Oil & Gas
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS
  • FIVE 90,000 GALLON STORAGE TANKS

19 AXLE DOLLIE SYSTEM

KATY, TX TO COLLBRAN, CO

19 AXLE DOLLIE SYSTEM / KATY, TX TO COLLBRAN, CO
11′ Diameter x 92′ Long / 214,000 lbs
Oil & Gas
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM
  • 19 AXLE DOLLIE SYSTEM

Nabors 805 Rig Move / Time Critical 168 Loads in 17 days

Pearland, TX to Care Terminal/ Houston, TX

Nabors 805 Offshore rig move from Pearland, TX to Care Terminal/ Houston, TX. Time Critical Transport consisting of 168 loads in 17 days. Loads consisting of legal flatbeds on up to 80′ long x 30′ wide x 17′ high modules that weighed up to 120,000 lbs.

Oil & Gas
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days
  • Nabors 805 Rig Move / Time Critical 168 Loads in 17 days

Have A question about a project?
Send us a message!

Fill out this form and our team will call you back shortly.

We will ensure that your project turns out exactly how you envisioned, on time, under budget and safely delivered.

* indicates required field